25 Mile Lateral Pipelines

In 2014, our team surveyed a gathering system consisting of 6 laterals and totaling 25 miles.

Field Work

  • Quality Control
  • Preliminary Route Surveying
  • Construction Staking
  • As-built Surveying

More Information

Image Source: Pumpco