EPIC Crude & NGL Pipelines

Landpoint was originally contracted by EPIC for services related to the preliminary components of the 25 mile Phase One 24″ Natural Gas Liquids (“NGL”) line in 2017. The total pipeline length spanned 650 miles from the Permian Basin to Corpus Christi. A parallel crude line is currently under construction.

Landpoint utilized its existing regional data to expedite the project planning process.

Scope / Requirements

  • Aerial Data Collection
  • Preliminary Route and Boundary Surveying
  • IFC Alignment Sheet Generation
  • Construction Staking
  • Full As-built Construction Data Collection
  • Enterprise GIS Management

Location

The project location spans from the New Mexico / Texas border to Corpus Christi.

Project Timeframe

2017-2020